The Jake Thomas Learning Centre Building Project Cookhouse and Park On the morning of Wednesday, August 28, 1996, Chief Jacob Thomas burnt tobacco at the Center of the excavation for a new building to carry instruction, ceremony, and administration for the preservation of traditional Iroquoian culture. In the spirit of the integrating ways of the Rotinonshón:ni, and honouring the shared teachings of the Elders, the Centre is being built with trust in the Creator, gifts from its members and patrons throughout North America and even Europe. William Woodworth, an architect who came to the learning Centre for instruction in January 1996, volunteered his time and expertise later that year. He created schematic drawings, which will be used as the preliminary sketches for further development towards the project. The structure will be positioned on its new site with the narrow
dimension facing the rising sun at Summer Solstice due east, adjacent to a smaller
structure built in 1996. Skylights will be placed through the
building to open up the structure to natural light. The walls will be weathered
pine board and batten and the roof smooth cedar shakes. An entrance porch at the
west end will open onto a circular drive with a garden centered around a fire
pit for the Burning Tobacco. Two pairs of doors open to the east and the rising
sun of the Summer Solstice. A deck there will face an eight sided pavilion separated
by another Burning Tobacco place. The total budget for the project, (including gifts received to date), will be over $575,882.00. An ambitious fundraising program is underway, and includes soliciting donations of materials and labour. The vision for the project is to restore and to reinvigorate some of the lost building traditions of the ancestors while providing a focus for the recovery of indigenous teachings so urgently called upon in the confusion of the 21st century. Chief Thomas's recitation of the Great Law in September 1996 coincided with the pouring of the floor plate. A tour of the construction site was conducted on Tuesday, September 10, 1996 at 6 pm. These are the plans to date: the building committee is currently reviewing them. Final drawings and costs are underway.
|